New England Air Systems has been privileged to play a significant role in the construction of the new OnLogic building in Williston, Vermont. For those not familiar, OnLogic is an industry leader in development and production of fanless computers which are so robust they can operate in many harsh environments. Their clients include many fortune […]
Uncategorized
Beta Technology – Battery Testing Facility Phase 1 & 2 – St.Albans, VT
We were awarded a project at Beta Technologies in St. Albans, located at the old Energizer facility. This facility will be used for testing batteries in multiple different configurations, as well as implementing numerous types of tests being done on their battery packs. The original project at Beta consisted of installing a new process cooling […]
IAQ – Marble Valley Regional Correctional Facility
The IAQ department completed a large cleaning job over the winter at one of Vermont’s state prisons, Marble Valley Regional Correctional Facility (MVRCF) located in Rutland, VT. The prison was completing an HVAC upgrade on their controls and needed our team to restore all the coils and ductwork to be within 90% of the original […]
UVM Medical Center Joy Drive: Dialysis Unit Chiller – South, Burlington VT
New England Air Systems recently completed a project at the UVMMC Dialysis building located on Joy Drive in South Burlington. This building provides dialysis services for patients 6 days a week, 16 hours a day and was in need of a new chiller for cooling their space during the day, essential for patients’ comfort. To […]
Westminster Cracker Co. – Rutland, VT
Westminster Cracker Co. has been making soup crackers since 1828 and are made in their manufacturing plant at the Howe Center in Rutland. Their secret ingredient (aged dough) uses lots of flour-one train car load every day. Handling the flour, the dust from moving it creates a health and fire safety concern, an issue to […]
Gifford Hospital Emergency Room HVAC Unit Replacement – Randolph, VT
Randolph, Vermont’s Gifford Medical Center’s Emergency Room had a 30-year-old AHU that was in need of replacement. It had served well beyond its life expectancy and was the perfect time to put something newer in place. New England Air Systems worked closely with Neagley & Chase on this project and our design team came up […]
Middlebury College – Trace Metal Lab – Middlebury, VT
New England Air Systems has completed many projects over the years at Middlebury College in Middlebury, Vermont. Recently we did some custom work to provide their new lab with climate control and constant positive air pressure to aid in their research of core samples of rocks, minerals, and other materials pulled deep from the ocean […]
Aten Dental Renovation – St. Albans, VT
Aten Dental of St. Albans expanded the space of their current practice, adding 3 new exam rooms with the addition of a clinical surgical suite. With the expansion and additions, we rearranged the existing HVAC system to accommodate the new practice layout and replaced the existing medical vacuum and medical air compressor. This project has […]
UVM Medical – Holly Court Pharmacy Expansion – Williston , VT
The UVM Medical Center pharmacy located in Williston, Vermont expanded their space into a single 10,347 square foot suite to create better workflow and more space for their daily operations. Providing the mechanical work for this expansion, we demoed existing ductwork, equipment, and gas piping to install replacements. The installation consisted of new equipment such […]
Williston Boy Scouts – Christmas Tree Collection
For the last several years, New England Air Systems has happily helped the Williston Boy Scouts by letting them barrow our stake bed truck to collect Christmas trees after the holidays from the neighborhood. They raised around $4,500 with this event.
Retirement
Bill Charbonneau, senior estimator retired from New England Air Systems on December 30 2023 after 39 years.
Proctor Academy Woodland Center
Proctor Academy added a new barn style building to their private boarding school campus located on 2,500 rural acres in Andover, NH. This new building includes a wet lab and dry lab classroom space, as well as classroom space for other departments that are looking to connect with the outdoors. To help make these new […]
Retirement
Dick Brooks – Retiring on February 18th after 50 years
KIDSAFE Collaborative Walking Challenge
As of March 23, 2021 New England Air System employees have raised $232.70 for the Kidsafe collaborative in the walking challenge. Kidsafe Collaborative is the only independent Chittenden County, Vermont agency that focuses on keeping our community working together to prevent and address child abuse and neglect.