• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
New England Air Systems

New England Air Systems

Complete Mechanical Solutions

  • Services
    • HVAC/R and Plumbing Design‑Build
    • Design-Assist
    • Mechanical Construction
      • Plumbing and Piping
      • Refrigeration
      • HVAC
      • Mechanical Insulating
      • Welding
      • Shutdown Services
    • Building Services and Maintenance
      • HVAC/R Service Maintenance + Repair
      • Indoor Air Quality
      • Specialty Refrigeration
    • Custom Fabrication
      • Waterjet Cutting
  • Industries
    • Healthcare
    • Industrial/Manufacturing
    • Institutional
    • Commercial
    • Government/Municipality
    • Grocery/Retail
    • Data Centers/IT
  • Projects
    • Health Care
    • Industrial / Manufacturing
    • Institutional
    • Commercial
    • Government / Municipality
    • Grocery / Retail
    • Data Centers & IT Rooms
  • About
    • Our Company
    • Our People
    • Commitment to Safety
    • News
    • Careers
    • Contact
HVAC system in Westminster cracker factory room

Westminster Crackers

red bar
  • What is this specific building/project’s purpose? 
  • Provide heating, cooling and ventilation for packaging area 
  • Recover waste heat from the tunnel oven area 
  • Describe the services you provided to this client.  
  • Innovative design transformed a “sweat shop” environment into a comfortable works space 
  • During winter months, waste heat from the ovens is transferred to other work areas that were typically cold all winter.  
  • Any challenges to overcome? 
  • Cracker production could not stop operation while we were installing the new system 
  • Very hot temperatures working over ovens 
  • High bay area for air distribution duct installation 
  • What resources were needed? 
  • Very experienced and organized field sheetmetal crew 
  • Custom fabrication for our shop 
  • Service department installing controls 
  • Good and responsive equipment vendor 
  • Any interesting details about this project? Size of facility, # of crew members, etc.  
  • Westminster Cracker is located at the Howe Center – a building designed to manufacture Howe scales back in the early 1900’s 
  • Mounting new HVAC units on the existing roof required close coordination and evaluation with the structural engineer. 
  • We designed a system that would cool and ventilation the bottom 14’ of occupied space in a 34’ high bay portion of the building rather than the entire space. 

Primary Sidebar

Project Details

Project Type(s):

Industrial / Manufacturing

Delivery Method(s):

Design / Build
Time & Material

Project value:

$340,000

Completion date:

September 2023

Location:

Rutland, VT

View all projects »

Project Images

  • ductwork in Westminster Cracker factory

View more of our Industrial / Manufacturing Projects:

HVAC system with teal and blue pipes

Husky Injection Molding – Chiller Plant Upgrades

Industrial / Manufacturing

Caledonia Spirits

Industrial / Manufacturing

Magic Mann

Industrial / Manufacturing

NE air employee working in large mechanical system room

Our Company

  • Services
  • Industries
  • Projects
  • About
  • Contact

Projects

  • Health Care
  • Industrial / Manufacturing
  • Institutional
  • Commercial
  • Government / Municipality
  • Grocery / Retail
  • Data Centers & IT

Our Locations

Main Office
43 Krupp Dr.
Williston, VT 05495

Rutland Office
157 North Main St.
Rutland, VT 05701

NH Office
10 Technology Dr.
West Lebanon, NH 03784


Phone
(802) 864-3800

Email
info@neair.com

24/7 Service
(802) 864-5959

New England Air Systems
  • Facebook
  • Instagram
  • LinkedIn

©Copyright 2024 – New England Air Systems – 43 Krupp Drive – Williston, VT 05495 – Website by Stride Creative Group.

X
Grow your career!
View current job openings »